From network profile
to live peering
A clear operational route from the first technical request to verified traffic exchange. Timing depends on port availability, transport, and cross-connect readiness.
- 01 · defined stages
- 06
- 02 · exchange ASN
- AS43268
- 03 · points of presence
- 3
- 04 · NOC operations
- 24/7
Every stage has a clear output.
The sequence keeps commercial, physical, routing, and operational work visible. Your assigned contact confirms dependencies and timing before each handoff.
- 01 Network profile ready
Confirm eligibility
Prepare your public ASN, address space, routing-policy records, and current NOC contacts.
- 02 Connection scope agreed
Define the connection
Select public or private peering, the required port capacity, and a preferred point of presence.
- 03 Request registered
Submit technical details
Send the ASN, organization, traffic profile, port requirement, and technical contact through the connection form.
- 04 Physical path confirmed
Arrange physical access
SNS-IX confirms the point of presence and coordinates a cross-connect or partner transport path.
- 05 Sessions validated
Configure BGP
Establish sessions with the route servers or selected bilateral peers, then validate filters and route objects.
- 06 Connection in operation
Verify and go live
Confirm route exchange, traffic flow, monitoring contacts, and the operating handover with the NOC.
Prepare the network record before the call.
A complete network profile removes avoidable back-and-forth and lets the engineering team focus on the physical and routing design.
- 01
Public ASN
A registered autonomous system number.
- 02
Address space
Provider-independent or provider-assigned prefixes announced by your network.
- 03
IRR records
Current route and maintainer objects in a recognized IRR.
- 04
PeeringDB profile
An up-to-date network record and peering contacts.
- 05
NOC contact
An operational email and phone for incident coordination.
Bring the ASN. We will map the route.
Send the network profile and preferred point of presence. The SNS-IX team will confirm availability, dependencies, commercial terms, and the next engineering action.